Quotations

OFFERS FOR ON GRID ROOFTOP SOLAR POWER PLANT

Model System Rating Qty. Rate Amount
5 KWp

 

 

Design, Engineering, Supply, Erection, Installation  & Commissioning of 5 KWp On grid connected solar PV plant system  generating daily approx. 20 units

BOM:

Solar Poly Crystalline PV module – 5 KWp. MNRE Approved
Inverter –Zever/ABB or Equivalent.
ACDB/DCDB

All required accessories – Reputed make
Module Mounting Structure –GI

5 KWp 80,000 4,00,000
NIL  tax in Maharashtra      
Final Cost to the customer     4,00,000
Customer’s Unit Rate (Assumed) : Rs. 15 Total Savings : Rs. 9,000/Month Rs. 1,80,000/Year

Download


Model System Rating Qty. Rate Amount
10 KWp

 

 

Design, Engineering, Supply, Erection, Installation  & Commissioning of 10 KWp On grid connected solar PV plant system  generating daily approx. 40 units

BOM:

Solar Poly Crystalline PV module – 10 KWp. MNRE Approved
Inverter –Zever/ABB or Equivalent.
ACDB/DCDB

All required accessories – Reputed make
Module Mounting Structure –GI

10 KWp 80,000 8,00,000
NIL  tax in Maharashtra      
Final Cost to the customer     8,00,000
Customer’s Unit Rate (Assumed) : Rs. 15 Total Savings : Rs. 18,000/Month Rs. 2,16,000/Year

Download

Model System Rating Qty. Rate Amount
15 KWp

 

Design, Engineering, Supply, Erection, Installation  & Commissioning of 15 KWp On grid connected solar PV plant system  generating daily approx. 60 units

BOM:

Solar Poly Crystalline PV module – 15 KWp. MNRE Approved
Inverter –Zever/ABB or Equivalent.
ACDB/DCDB

All required accessories – Reputed make
Module Mounting Structure –GI

15 KWp 80,000 12,00,000
NIL  tax in Maharashtra      
Final Cost to the customer     12,00,000
Customer’s Unit Rate (Assumed) : Rs. 15 Total Savings : Rs. 27,000/Month Rs. 3,40,000/Year

Download


Model System Rating Qty. Rate Amount
20 KWp

 

Design, Engineering, Supply, Erection, Installation  & Commissioning of 20 KWp On grid connected solar PV plant system  generating daily approx. 80 units

BOM:

Solar Poly Crystalline PV module – 20 KWp. MNRE Approved
Inverter –Zever/ABB or Equivalent.
ACDB/DCDB

All required accessories – Reputed make
Module Mounting Structure –GI

20 KWp 80,000 16,00,000
NIL  tax in Maharashtra      
Final Cost to the customer     16,00,000
Customer’s Unit Rate (Assumed) : Rs. 15 Total Savings : Rs. 36,000/Month Rs. 4,32,000/Year

Download

Model System Rating Qty. Rate Amount
40 KWp

 

Design, Engineering, Supply, Erection, Installation  & Commissioning of 40 KWp On grid connected solar PV plant system  generating daily approx. 160 units

BOM:

Solar Poly Crystalline PV module – 40 KWp. MNRE Approved
Inverter –Zever/ABB or Equivalent.
ACDB/DCDB

All required accessories – Reputed make
Module Mounting Structure –GI

40 KWp 80,000 32,00,000
NIL  tax in Maharashtra      
Final Cost to the customer     32,00,000
Customer’s Unit Rate (Assumed) : Rs. 15 Total Savings : Rs. 72,000/Month Rs. 8,64,000/Year

Download


Model System Rating Qty. Rate Amount
100 KWp

 

Design,Engineering,Supply, Erection, Installation  & Commissioning of 100 KWp Ongrid connected solar PV system generating daily aprox 400 units

BOM:

Solar Poly Crystalline PV module – 100 KWp. MNRE Approved
Inverter –Zever/ABB or Equivalent.
ACDB/DCDB

All required accessories – Reputed make
Module Mounting Structure –GI

100 KWp 80,000 80,00,000
NIL  tax in Maharashtra      
Final Cost to the customer     80,00,000
Customer’s Unit Rate (Assumed) : Rs. 15 Total Savings : Rs. 1,80,000/Month Rs. 21,60,000/Year

Download

 

General Term & conditions :

Installation Charges : included in price.

Transportation: Prices are FOR Site.

Delivery Period: Within 30 Days from date of order with advance payment.

Payment Terms: 80 % Advance with PO, 15 % on readiness of material & 5 % on Installation.

Panel Warranty: 10 Years for solar panel from the manufacturer. Solar panel performance warranty 25 years as per OEM terms. Solar panel will decline in output annually by no more than 0.7%. At the end of 25 years at least 80% of the peak power can be achieved.

Inverter Warranty: 5 years from the manufacturer.

Customer will have to clean solar panels for mud & dust once in 15 days regularly so that solar panel power output does not drop.
We hope you will find our offer suitable and competitive. We look forward to receive your valued order.

Thanking you,

For Belifal Innovations & Technologies Pvt. Ltd.

Kumaar Thakkar MD & Chief Innovator 9821072175